News

WFEL completes Australian Land 155 first tranche bridging delivery

Under the Land 155 Enhanced Gap Crossing Capability project, the Australian Defence Force (ADF) has taken delivery of the first scheduled tranche of WFEL’s rapidly-deployable military bridges, including Dry Support Bridges and Medium Girder Bridges.

The Dry Support Bridges (DSBs), capable of carrying over 120 tonnes, have been delivered following extensive trials at the UK’s Millbrook Proving Ground, to verify both off-road and on-road capability and in accordance with a series of demanding mandated Specifications, Audits and Project Reviews determined by the Australian Government.

Also supplied for Land 155 are WFEL’s double-storey, link-reinforced Medium Girder Bridge systems (MGBs), which can span up to 49 metres and which will be supplemented by additional portable Pier and Span equipment, allowing bridges of up to 76 metres to be constructed.

As the bridges provide temporary infrastructure and will be used in the ADF’s Combat Support and Disaster Relief operations, both DSB and MGB bridging systems are being delivered complete with walkways, to allow the separation of vehicular traffic from pedestrians. WFEL’s comprehensive Integrated Logistics Support package is also being supplied, to cover through-life support for the bridges.

WFEL is also currently fulfilling further DSB orders for the U.S. Army in support of its European Deterrence Initiative. This supply of additional Dry Support Bridges will bring the U.S. Army’s stockholding up to almost 120 systems.

Ian Wilson, Chief Executive of WFEL, said: “The adoption of the DSB not only provides the ADF’s Manoeuvre Commanders with the ability to cross significant wet or dry gaps quickly and efficiently, it allows a level of inter-operability with an ever-growing user base.

“This significant and growing installed base of DSB equipment, allied to our fully-operational production line, ensures that WFEL’s customers have a high level of confidence not only in our products but also in our continued through-life support and spares availability.”

WFEL will complete final delivery of the ADF’s bridges by September 2018.

If you would like to join our community and read more articles like this then please click here.

The post WFEL completes Australian Land 155 first tranche bridging delivery appeared first on Defence Online.

Free Tender Search

Recent Posts

 

Who are we?

From publishing the first national directory of public sector contracts, to being the first to market with our online Tracker solution, we have been the true pioneers of technology and innovation in the public sector marketplace. Throughout our 39 years, we have continued to evolve and chart new territory – placing our customers at the heart of everything we do. Take your business to the next level with Tracker now.

Try out DCI Today

Try out DCI Today

    BiP Solutions owns Tracker and we look after your details carefully. We offer a range of products, services and events (some of which are free) that help buyers tender more efficiently and suppliers find, bid for and win public and private sector contracts. Only tick this box if you wish to receive information about these. We will never share your details with third parties and you will have the opportunity of opting out of communications every time we contact you. For further details, please see our Privacy Policy